Alarm System Installation - ESIC Hospital, Odisha
Commercial

Alarm System Installation - ESIC Hospital, Odisha

Green Leaf Construction executed the complete alarm system installation work at the ESIC Hospital, Odisha. The project involved high-quality wiring, alarm panel setup, and safety system integration to ensure real-time fire and emergency alerts as per ESIC safety norms and government standards.

Timeline 24 months
Units 140

Project Execution

At ESIC Hospital, Odisha, we executed a complete Alarm System Installation designed to enhance safety, improve emergency response time, and ensure full compliance with national fire and electrical safety standards.
Our team carried out the installation using high-quality equipment, structured wiring, and advanced detection technology to ensure smooth and reliable system performance.

This project involved detailed planning, precise integration, and comprehensive testing to ensure the alarm system functions effectively across all hospital zones. The goal was to provide real-time alerts, faster response, and continuous monitoring for critical patient and public safety.

Key Achievements

Advanced System Design

The alarm system was designed as per hospital safety protocols, ensuring early detection, zone-based alerts, and seamless integration with existing emergency systems.

Safety Excellence

All devices, panels, detectors, and cables used in this project comply with required healthcare safety standards, ensuring uninterrupted operation in critical environments.

On-Time Delivery

Despite working in an active hospital environment, our team completed the installation on time without disturbing daily operations.

Project Specifications

Building Type Hospital Facility
System Installed Fire Alarm & Detection System
System Type Addressable
Detectors Installed Smoke, Heat & Multi-Sensor Detectors
Panels Installed Main Fire Alarm Control Panel + Repeater Panels
Cabling Standard UL Approved Cables
Start Date January 2024
Expected Completion December 2025
Project Progress 95%